TIME
|
SPEAKERS
|
SUBJECT
|
|
09:00
|
Peder
Andersen
President
of CICIND
|
Opening
and Welcome
|
|
09:05
|
Eric
Yaszemski
Vice Presidentof Henkel US
|
Welcome
Greetings from the Main Sponsor
|
|
09:10
|
Klaus Kaemmer
Secretary
of CICIND
|
Notices
|
|
09:20
|
Randy
Rawson
American
Boiler Manufacturers Ass.
|
The U.S.
Chimney Industry with regard to
Energy and
Environmental Policy.
|
|
09:50
|
Hermann
Hoffmeister
/ Albert de Kreij
Karrena GmbH / Hadek
|
Chimney
Design for Wet Operation
|
|
10:20
|
Bruce Luke
Henkel
Technologies
|
Historic
Development and Early Use of
Borosilicate
Block Linings for FGD Service
|
|
10:50
|
COFFEE / TEA
|
|
11:20
|
Arun
Bhowmik / Victor Bochicchio
Hamon Custodis
|
Conversion
of Dry Chimneys to Wet FGD Operation
|
|
11:50
|
Gottfried
Nonhoff
University
of Aachen
|
GRP / FRP
in Chimney Engineering
|
|
12:20
|
David
Anderson
Alden
|
Flow
Modelling in Wet Stacks
|
|
12:50
|
LUNCH
|
|
14:00
|
I.
Davidovic / F. Hrdlicka / B. Jezek
Omega Teplotechna
|
Chimneys
versus Cooling Towers
|
|
14:20
|
John Sowizal
Industrial Chimney Engineers Co, Ltd.
|
Wet FGD
Chimneys - Current Trends
|
|
14:40
|
Rick Lohr
Karrena International LLC
|
Brick
Liners again in Chimneys
|
|
15:00
|
COFFEE /
TEA
|
|
15:15
|
PANEL
DISCUSSION
EU: C. Goddard, H. Hoffmeister, G. Nonhoff,
USA: D. Anderson, V. Bochicchio, P. Hsu
|
WET STACK
OPERATION
Mediator: Gary Eastman,
Bierrum Int.
|
|
16:45
|
CLOSE
|
|
TIME
|
SPEAKERS
|
SUBJECT
|
|
09:00
|
Heiner Stahl
Massenberg GmbH
|
Maintenace
of Cooling Towers downstream Boilers
with and without FGD
|
|
09:20
|
Michael
Barnsteiner
MB Schornsteinabbruch
|
Dismantling
Techniques for High Concrete Chimneys with Brickliners
|
|
09:40
|
Mark
Loizeaux
Controlled Demolition Inc.
|
Demolition
of the Trojan Cooling Tower
|
|
10:00
|
Darren Smith
Zenith SAS Ltd.
|
Overcoming
Access Issues Whilst Repairing
a Hyperbolic Cooling Tower
|
|
10:20
|
Andreas Kochan
MC Bauchemie
|
Certain
aspects for surface protection of RC-chimneys with wet stack operation
|
|
10:40
|
Gerrit Verboom
OTASY
|
Cross-wind
stresses with ASME and Eurocode
|
|
11:00
|
COFFEE
/ TEA
|
|
11:20
|
P.
Noakowski
Failure Analysis Associates
|
Design
Aspects of a Double Flue Chimney
in Egypt
|
|
11:40
|
Steven
Reid
Industrial
Environmental Systems, Inc.
|
Basics of
Wind and Chimney Engineering
|
|
12:00
|
Gilles
Oudin
Multitech
|
Tuned Mass
Damper on a Concrete Stack
Experience
after one year of site measurments
|
|
12:20
|
Henk van Koten /Eef van den Berg
Flow
Engineering
|
Vibration
Dampers with Test Certificate
|
|
12:40
|
Marek
Lechman
Building Research Institute Warsaw
|
Dimensioning
of non-circular cross-sections
of RC chimneys
according to EN 13084 and ACI 307-98
|
|
12:50
|
LUNCH
|
|
14:00
|
NORMAL GENERAL ASSEMBLY
|
|
|
|
President’s
report
|
Secretary´s
report
|
|
|
Membership
report
|
Financial
report
|
|
|
Governing
Body elections
|
Any other
business
|
|
15:00
|
CLOSE
|