Linings

LININGS Effect of FGD

Chimneys for wet scrubber power plant applications
Sowizal, J.C. ; Vol. 13, No. 2, 1997
Order Ref: CR-154 Price: Band A

FGD - Past experience has shown that failures can be prevented
Henseler, F. ; Vol. 13, No. 2, 1997
Order Ref: CR-153 Price: Band A

Application of high nickel alloy liners in chimneys in FGD service
Plant, W. ; Vol. 12, No. 1, 1996
Order Ref: CR-085 Price: Band A

Application of protective linings to flues and ductwork in FGD environment
Collier, S. ; Vol. 12, No. 1, 1996
Order Ref: CR-087 Price: Band A

Corrosion Protection of Steel Liners in Chimneys Serving Plants with FGD on Stream
Beaumont, M., Uliana, A.F. & Poli, M. ; Vol. 6, No. 2, 1990
Order Ref: CR-082 Price: Band A

Behaviour of various lining materials and metals in an FGD pilot plant
Uliana, F., Scolari, P.V. & Poli, M. ; Vol. 12, No. 1, 1996
Order Ref: CR-084 Price: Band A

Innovative Solutions to Chimney Lining Problems
Snook, R.W. ; Vol. 3, No. 2, 1987
Order Ref: CR-081 Price: Band A

Installation and operation of titanium linings in FGD ductwork and stacks
Peacock, D. ; Vol. 12, No. 1, 1996
Order Ref: CR-086 Price: Band A

Protection of an FGD Plant: Surface Treatment of Steel after Several Years of Operation
Van Der Sloot, R.J.S. ; Vol. 6, No. 2, 1990
Order Ref: CR-083 Price: Band A

Repairing chimney liners using borosilicate glass blocks
den Boogert, E., de Kreij, A. & Huxley, N. ; Vol. 12, No. 1, 1996
Order Ref: CR-088 Price: Band A

Nickel containing materials in flue gas desulfurization equipment
Plant W.D.H., Mathay W.L. ; Vol. 15, No. 2, 1999
Order Ref: CR-190 Price: Band A

LININGS GRP/FRP Liners

Design of a "Sandwich" GRP Chimney Liner Incorporating Thermal Insulation
Oudin, G. ; Vol. 11, No. 2, 1995
Order Ref: CR-074 Price: Band A

Design of FRP equipment for FGD systems
Ness, J. ; Vol. 13, No. 1, 1997
Order Ref: CR-077 Price: Band A

Design of sandwich GFRP chimneys
Maslov ; Vol. 13, No. 1, 1997
Order Ref: CR-080 Price: Band A

GRP Liners - Review by the CICIND Committee Chairman
Reid, S. ; Vol. 17, No. 1, 2001
Order Ref: CR-215 Price: Band A

Large diameter GRP liners in the United States
Ershig, A.H. ; Vol. 13, No. 1, 1997
Order Ref: CR-076 Price: Band A

Phenolic resins in stack and flue service
Heppenstall & Orpin ; Vol. 13, No. 1, 1997
Order Ref: CR-079 Price: Band A

Structural behaviour of a 160m chimney with GRP liner, 2.5m diameter
Di Poi, G. ; Vol. 13, No. 1, 1997
Order Ref: CR-078 Price: Band A

The use of FRP in flue gas desulphurisation processes
Kamody, J. ; Vol. 13, No. 1, 1997
Order Ref: CR-075 Price: Band A

The use of GRP to repair chimney liners in an FGD environment
Schmidt, R. ; Vol. 14, No. 1, 1998
Order Ref: CR-159 Price: Band A

FRP-liner with heating system as measure to prevent the formation of particles and droplets
Ertz, B. ; Vol. 19, No. 1, 2003
Order Ref: CR-234 Price: Band A

LININGS Brickwork Liners

Brick lining versus Pennguard lining - can Pennguard win?
Noakowski, P. & de Kreij, A. ; Vol. 15, No. 1, 1999
Order Ref: CR-176 Price: Band A

The plasticity behaviour of potassium silicate mortars
Sipek, J., Kolisko, J. ; Vol. 16, No. 1, 2000
Order Ref: CR-199 Price: Band A

Behaviour of the liner support system in a multi-flue chimney
Noakowski, P. & Van Dornick, K. ; Vol. 8, No. 2, 1992
Order Ref: CR-066 Price: Band A

Brick lining reinforcement with protective coating
Busch, D. & Noakowski, P. ; Vol. 10, No. 2, 1994
Order Ref: CR-068 Price: Band A

Consequence of a sudden interruption of gas flow
Haag, G. & Noakowski, P. ; Vol. 9, No. 2, 1993
Order Ref: CR-067 Price: Band A

Design and construction of elliptical brickwork linings
Van Dornick, K. & Noakowski, P. ; Vol. 8, No. 1, 1992
Order Ref: CR-065 Price: Band A

Investigations of the Comparability of Different Standards for the Determination of the Acid Resistance of Bricks
Bottenbruch, H. & Posch, H. ; Vol. 2, No. 2, 1986
Order Ref: CR-063 Price: Band A

Thermal stress states in acid-resisting brickwork linings for industrial chimneys
Da Rin, E.M. & Uliana, A.F. ; Vol. 8, No. 1, 1992
Order Ref: CR-064 Price: Band A

Thermal stresses in brickwork liners downstream of FGD
Lechman, M. ; Vol. 13, No. 1, 1997
Order Ref: CR-069 Price: Band A

Maintenance of brickwork linings and environmental impact
González Flórez, C. & del Solar, J.; Vol. 19, No. 2, 2003
Order Ref: CR-240 Price: Band A

LININGS Concrete Liners

Concrete Chimneys with Cast-In-Situ Linings of Polymer Cement Concrete
Lebedev, V.G. ; Vol. 7, No. 2, 1991
Order Ref: CR-072 Price: Band A

Unexpected Behaviour of some R.C. Chimneys in Polish Heat-Generating Plants
Lechman, M. & Lewinski, P. ; Vol. 11, No. 2, 1995
Order Ref: CR-073 Price: Band A

LININGS On-line monitoring

Hot Camera Inspections
Miller, J.D. ; Vol. 3, No. 1, 1987
Order Ref: CR-090 Price: Band A

Introduction to Thermography
Van Chastelet, L. ; Vol. 3, No. 1, 1987
Order Ref: CR-091 Price: Band A

Monitoring of Chimney Performance
Aschieri, F. ; Vol. 7, No. 2, 1991
Order Ref: CR-092 Price: Band A

LININGS Performance

Behaviour of linings in chimneys of Electricité de France
Thoraval, G ; Vol. 8, No. 1, 1992
Order Ref: CR-094 Price: Band A

Flue gas liners under extreme operating conditions
Kremser, B.; Vol. 18, No. 1, 2002
Order Ref: CR-223 Price: Band A

Overview of US experience with linings and coatings for concrete chimneys
Sowizal, J.C. ; Vol. 8, No. 1, 1992
Order Ref: CR-093 Price: Band A

LININGS Seals

Elastomeric seals fitted downstream of FGD at Drax power station
Brown, T.R. & Evans, W. ; Vol. 10, No. 1, 1994
Order Ref: CR-096 Price: Band A

History of the development of fluorelastomer compounds for use in flue expansion joints
Bauerle, J.G. ; Vol. 12, No. 2, 1996
Order Ref: CR-098 Price: Band A

Sealing joints for chimney liners
Poli, M. ; Vol. 9, No. 2, 1993
Order Ref: CR-095 Price: Band A

The RAL quality control system for expansion joints and seals in industrial chimneys
Tuckmantel, H.J. ; Vol. 11, No. 1, 1995
Order Ref: CR-097 Price: Band A

Fundamental procedures and techniques for planning, repair, retrofit and maintenance of non-metallic expansion joints and chimney seals to 600°C for scheduled and unscheduled outages
Reichel, H. & Brown, T. ; Vol. 19, No. 2, 2003
Order Ref: CR-241 Price: Band A

LININGS Steel Liners

Hot Air Jacket For 150m Multi-Flue Steel Liners in a 150m Tall Chimney
Davenport, J.F. & Smith, D.T. ; Vol. 7, No. 2, 1991
Order Ref: CR-070 Price: Band A

Practical aspects of fabricating nickel-chromium alloys: Lining and overlaying
Plant, D. ; Vol. 16, No. 2, 2000
Order Ref: CR-205 Price: Band A

The effect of spiral gas flow on steel chimney liners
Bierrum, N.R. ; Vol. 12, No. 1, 1996
Order Ref: CR-071 Price: Band A

Steel flues in a RC chimney 300m high. Excessive vibrations and arrangements fro strengthening
Ciesielski R.; Vol. 15, No. 2, 1999
Order Ref: CR-189 Price: Band A

Clad steel plates for chimney liner applications in Japan
Akabane H., Yamamura Y., Saito Y..; Vol. 15, No. 2, 1999
Order Ref: CR-191 Price: Band A

Clad plate forair pollution control equipment
Akabane H., Yamamura Y. & Saito Y..; Vol. 16, No. 2, 2000
Order Ref: CR-206 Price: Band A